PPL LED The Open

We work with The R&A to make sure the locations of the screens are correct. We install the structure, make sure it is level, then install the LED tiles. Finally we connect it to a generator power source and test the screen.

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *